Pan, M., Wong, M.O., Lam, C.C., and Pan, W. (2024). Integrating extended reality and robotics in construction: a critical review. Advanced Engineering Informatics, In Press.
Zeng, J., Xie, W., & Pan, M. (2024). A discrete moth-flame optimization algorithm for multiple automated guided vehicles scheduling problem in a matrix manufacturing workshop. Applied Soft Computing, 111846.
Zhang, Y., Pan, M., Pan, W., Yang, Y., and Wu, J. (2024). Enhancing modular construction supply chain: Drivers, opportunities, constraints, concerns, strategies, and measures. Developments in the Built Environment, 100408.
Pan, W., Pan, M.*, and Yang, Y. (2023). A dialectical system framework for enhancing modular construction supply chain. Proceedings of the Institution of Civil Engineers – Engineering Sustainability. Ahead of Print.
Pan, W., Parker, D., and Pan, M.* (2023). Problematic Interfaces and Prevention Strategies in Modular Construction. Journal of Management in Engineering. https://doi.org/10.1061/JMENEA.MEENG-5083
Pan, M., Yang, Y., Zheng, Z. and Pan, W.* (2022). Artificial intelligence and robotics for prefabricated and modular construction: a systematic literature review. Journal of Construction Engineering and Management, 148(9), 03122004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002324
Pan, W., and Pan, M.* (2022). Rethinking lean synergistically in practice for construction industry improvements. Engineering, Construction and Architectural Management, ahead-of-print. https://doi.org/10.1108/ECAM-04-2021-0346
Pan, W., Yang, Y., and Pan, M.* (2022). Implementing modular integrated construction in high-rise high-density cities: perspectives in Hong Kong. Building Research & Information, 1-15. https://doi.org/10.1080/09613218.2022.2113024
Zheng, Z., Pan, M. Yang, Y., and Pan, W.* (2022) Motion planning for efficient and safe module transportation in modular integrated construction. Computer-Aided Civil and Infrastructure Engineering, ahead-of-print. https://doi.org/10.1111/mice.12835
Yang, Y., Pan, M.* and Pan, W. (2022). Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6), 04022032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002280
Pan, W., and Pan, M.* (2021). Drivers, barriers and strategies for zero carbon buildings in high-rise high-density cities. Energy and Buildings, 242, 110970. https://doi.org/10.1016/j.enbuild.2021.110970
Yang, Y.*, Pan, M., Pan, W. and Zhang Z. (2021) Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects. Journal of Management in Engineering, 37(3), 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905
Zhang Z., Pan, W.*, and Pan, M. (2021). Critical Considerations on Tower Crane Layout Planning for High-rise Modular Integrated Construction. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-03-2021-0192
Pan, M. and Pan, W*. (2020) Knowledge, attitude and practice towards zero carbon buildings: Hong Kong case. Journal of Cleaner Production, 274, 122819. https://doi.org/10.1016/j.jclepro.2020.122819
Pan, M.*, Linner, T., Pan, W., Cheng, H. M. and Bock, T. (2020). Structuring the context for construction robot development through integrated scenario approach. Automation in Construction, 114, 103174. https://doi.org/10.1016/j.autcon.2020.103174
Pan, M.*, Linner, T., Cheng, H. M., Pan, W. and Bock, T. (2020). Influencing factors of the future utilisation of construction robots for buildings: A Hong Kong perspective. Journal of Building Engineering, 30, 101220. https://doi.org/10.1016/j.jobe.2020.101220
Pan, M.* and Pan, W. (2020). Stakeholder perspectives on the future application of construction robots for building in a dialectical system framework, Journal of Management in Engineering. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000846
Pan, M.* and Pan, W. (2020). Understanding the determinants of construction robot adoption: the perspective of building contractors. Journal of Construction Engineering and Management, 146(5), 04020040. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001821
Pan, W.* and Pan, M. (2020) A ‘demand-supply-regulation-institution’ stakeholder partnership model of delivering zero carbon buildings, Sustainable Cities and Society, 62, 102359. https://doi.org/10.1016/j.scs.2020.102359
Pan, M.* and Pan, W. (2019). Determinants of adoption of robotics in precast concrete production for buildings. Journal of Management in Engineering, 35(5), 05019007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000706
Yang, Y., Pan, M.* and Pan, W. (2019). ‘Co-evolution through interaction’ of innovative building technologies: The case of modular integrated construction and robotics. Automation in Construction, 107, 102932. https://doi.org/10.1016/j.autcon.2019.102932
Pan, W.* and Pan, M. (2019). Opportunities and Risks of Implementing Zero-Carbon Building Policy for Cities: Hong Kong Case. Applied Energy, 256, 113835. https://doi.org/10.1016/j.apenergy.2019.113835
Pan, M.*, Linner, T., Pan, W., Cheng, H. M. and Bock, T. (2018). A Framework of Indicators for Assessing Construction Automation and Robotics in the Sustainability Context. Journal of Cleaner Production, 182, 82-95. https://doi.org/10.1016/j.jclepro.2018.02.053
Pan, W.* and Pan, M. (2018) A dialectical system framework of zero carbon emission building policy for high-rise high-density cities: Perspective from Hong Kong. Journal of Cleaner Production, 205, 1-13. https://doi.org/10.1016/j.jclepro.2018.09.025
Yang Q., Yang Y., Liu Y., Lian Y., Xie W., Zhang L., Pan, M. (2022) Visual Servoing of AGV Based on Nonlinear Model Predictive Control. In: Proceedings of the 34th Chinese Control and Decision Conference.
Zhang, Y., Yang, Y., Pan, W., Pan, M. (2021) Key Performance Indicators of Offsite Construction Supply Chains: A Review. In: Proceedings of the 38th International Symposium on Automation and Robotics in Construction (ISARC).
Zheng, Z., Pan, M. and Pan, W. (2020) Virtual Prototyping Based Path Planning of Unmanned Aerial Systems for Building Exterior Inspection. In: Proceedings of the 37th ISARC, pp.16-23.
Pan, W., Pan, M. and Zheng, Z. (2020) A Novel Methodological Framework of Smart Project Delivery of Modular Integrated Construction. In: Proceedings of the 37th ISARC, pp.1090-1097.
Pan, M. and Pan, W. (2019) System boundaries of implementing construction robots for buildings. The CIB World Building Congress 2019, Hong Kong, 17 – 21 June 2019.
Linner, T., Pan, M., Pan W., Taghavi M., Pan, W. and Bock T. (2018) Identification of usage scenarios for wearable robotic technology in the context of the Hong Kong construction industry. In: Proceedings of the 35th International Symposium on Automation and Robotics in Construction (ISARC), pp. 40-47, Berlin, Germany, 20 – 25 July 2018.
Pan, M. Yang Y. and Pan, W. (2017) Modelling and analysis of two production solutions for precast concrete elements: A Petri-nets approach. In: 2017 Modular and Off-site Construction (MOC) Summit Proceedings, Shanghai, China, Nov. 10-12, 2017.
Yang Y., Pan, W. and Pan, M. (2017) Manufacturing of modular buildings: A literature review. In: 2017 Modular and Off-site Construction (MOC) Summit Proceedings, Shanghai, China, Nov. 10-12, 2017.
Pan, W. and Pan, M. (2017) Policy scenarios of zero carbon building for Hong Kong: to survive or to lead? In: Proceedings of World Sustainable Built Environment Conference 2017 Hong Kong (WSBE17), Hong Kong, 5-7 Jun 2017.
Pan, M., Linner, T., Cheng H. M., Pan, W. and Bock T (2016) A framework for utilising automated and robotic construction for sustainable building. Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate (CRIOCM), pp. 79-88, Springer, Singapore.
Pan, M. and Pan, W. (2016) Advancing formwork systems for the production of precast concrete building elements: from manual to robotic. In: Modular and Off-site Construction (MOC) Summit Proceedings, Edmonton, Canada, 29 Sep. – 1 Oct. 2016.
Pan, W. and Pan, M. (2016) Status quo and future development of lean construction in Hong Kong. CIB World Building Congress 2016 Intelligent Built Environment or Life, Tampere, Finland, 30 May – 3 June 2016.
Pan, M. and Wu, W. (2014) Performance analysis of scheduling rules in remanufacturing operations using stochastic Petri nets. In: Networking, Sensing and Control (ICNSC), 2014 IEEE 11th International Conference on, pp. 120-125.
Pan, M. and Wu, W. (2013) A Petri net approach for green supply chain network modeling and performance analysis. In: Proceedings of 11th International Conference on Business Process Management (BPM 2013), Beijing, China, August 26-31, 2013.
Pan, M. and Wu, W. (2013) Supply chain uncertainty under ARIMA demand process. In: Proceedings of 11th International Conference on Business Process Management (BPM 2013), Beijing, China, August 26-31, 2013.
Pan, M. and Kang, W. (2011) Palm vein recognition based on three local invariant feature extraction algorithms. Biometric Recognition, Springer Berlin Heidelberg, 2011. pp 116-124.
Contact
Telephone: (853) 8822-4452
Email: mipan@um.edu.mo
Faculty of Science and Technology
University of Macau, E11
Avenida da Universidade, Taipa,
Macao, China